September 27-30, 2016. Hamburg, Germany. Hall A1 Booth 141
Our stand at WindEnergy Expo in Hamburg.
DTBird & DTBat stand at WindEnergy Expo in Hamburg, 2016.
September 27-30, 2016. Hamburg, Germany. Hall A1 Booth 141
Our stand at WindEnergy Expo in Hamburg.
DTBird & DTBat stand at WindEnergy Expo in Hamburg, 2016.
DTBirdV8D10 model is designed for large on & offshore wind turbines, with 8 HD cameras it reaches bird detection up to a distance of 600 m and 360º around the WTG. In addition, Collision Avoidance module D10 entails 10 Speakers at 2 heights that assures proper sound distribution in the entire rotor swept area.
The DTBatD3 model includes 3 bat detectors distributed along the tower of the wind turbine at the height of the rotor swept area. This unique model, together with the bat Stop Control module assures proper bat protection at large wind turbines.
These DTBird® and DTBat® models have been installed in a 140 m height and 112 m diameter wind turbine in Austria.
DTBirdV8D10 & DTBat D3 units installed in Austria.
In the following months, 9 additional DTBird® & DTBat® units will be installed in Austria and the USA. With these installations, the number of units installed worldwide will reach 82, distributed throughout 11 countries. See the updated DTBird® brochure with the installations map.
You can meet DTBird® Team and get your first hand information in:
May 23-26, 2016 New Orleans, Louisiana. Booth 2047.
September 27-30, 2016. Hamburg, Germany. Hall A1 Booth 141
The new way to keep you updated about DTBird® System: upgrades, new features, new projects, participation in exhibitions and conferences, editorials, and more. Newsletter Subscription
Get your first hand information on new and improved DTBird features. New upgraded Stop Control Proposal for Eagles.
DTBird & DTBat Stand at Vind 2015.
DTBird multiply by 16 Data Analysis Platform Servers Capabilites to continue providing access to all historical bird flights of all clients. This service started in June 2012, and currently stores more than 100.000 bird flights.
DTBird Servers.
BST (Basic Safety Training) Offshore Homologue by GWO (Global Wind Organisation), Offshore (5 modules - 7 days) which includes:
GWO BST First Aid.
GWO BST Manual Handling.
GWO BST Fire Awareness.
GWO BST Working at Heights.
GWO BST Sea Survival.
Members of the DTBird Installation Team.
DTBird has started protecting birds and monitoring bats in Martifer/Ikea Wind Farm in Podkarpackie. Currently, DTBird is monitoring/protecting birds/bats in France, Greece, Italy, Norway, Poland and Spain. Available worldwide. November 2013.