The model DTBirdV4D8 has been installed in the Wind Farm Terna, in Thrace (Greece) under the project LIFE12 BIO/GR/000554. This project aims to demonstrate the practical application of post-construction assessment and post-construction mitigation. DTBird was already participating in the LIFE project with the model DTBirdV4D4 that started operating at the Wind Farm and the Park of Energy Awareness (PENA) of CRES at Keratea (Greece) at the beginning of 2016.

 

DTBirdV4D8 installation in Wind Farm Terna Greece

DTBird model V4D8 installation in Wind Farm Terna, Greece.