Notice: Only variables should be passed by reference in /var/www/vhosts/dtbird.com/httpdocs/plugins/system/virtualdomains/virtualdomains.php on line 221
DTBat
Loader
Bat Smart & Transparent
Wind Power
DTBat
DTBirdV4D8 model is included in LIFE project

The model DTBirdV4D8 has been installed in the Wind Farm Terna, in Thrace (Greece) under the project LIFE12 BIO/GR/000554. This project aims to demonstrate the practical application of post-construction assessment and post-construction mitigation. DTBird was already participating in the LIFE project with the model DTBirdV4D4 that started operating at the Wind Farm and the Park of Energy Awareness (PENA) of CRES at Keratea (Greece) at the beginning of 2016.

 

DTBirdV4D8 installation in Wind Farm Terna Greece

DTBird model V4D8 installation in Wind Farm Terna, Greece.

DTBirdV4D8 model is included in LIFE project

The model DTBirdV4D8 has been installed in the Wind Farm Terna, in Thrace (Greece) under the project LIFE12 BIO/GR/000554. This project aims to demonstrate the practical application of post-construction assessment and post-construction mitigation. DTBird was already participating in the LIFE project with the model DTBirdV4D4 that started operating at the Wind Farm and the Park of Energy Awareness (PENA) of CRES at Keratea (Greece) at the beginning of 2016.

 

DTBirdV4D8 installation in Wind Farm Terna Greece

DTBird model V4D8 installation in Wind Farm Terna, Greece.

DTBird in Germany

At first, at the end of 2015, DTBirdV4 started operating in the offshore Platform FINO 1, over 40km offshore in the North Sea, contracted by the Bundesamt für Seeschiffahrt und Hydrographie (BSH). This year the models DTBirdV4D8 and DTBirdV8 have been installed for the first time in onshore wind turbines in Lower Saxony and Bavaria.

DTBird will participate in the following events, the first one giving the guest lecture of "Field Ornithology" at the University of Applied Sciences Weihenstephan-Triesdorf on April 10th. In the second event DTBird will attend WindEnergy Hamburg at hall A1, stand 203 on September 25-28th.

DTBird models installation in onshore wind turbine Germany

DTBird models installed in onshore wind turbines, Germany.

DTBird in Germany

At first, at the end of 2015, DTBirdV4 started operating in the offshore Platform FINO 1, over 40km offshore in the North Sea, contracted by the Bundesamt für Seeschiffahrt und Hydrographie (BSH). This year the models DTBirdV4D8 and DTBirdV8 have been installed for the first time in onshore wind turbines in Lower Saxony and Bavaria.

DTBird will participate in the following events, the first one giving the guest lecture of "Field Ornithology" at the University of Applied Sciences Weihenstephan-Triesdorf on April 10th. In the second event DTBird will attend WindEnergy Hamburg at hall A1, stand 203 on September 25-28th.

DTBird models installation in onshore wind turbine Germany

DTBird models installed in onshore wind turbines, Germany.

DTBird and DTBat start operating in The Netherlands
First DTBirdV8 unit and DTBatD3 unit have started operating in Windpark Krammer, located in Zeeland, The Netherlands. Additional units will be installed during the wind farm construction until 2019. These are the first DTBird&DTBat units installed in concrete towers.

DTBird model installation Wind Farm Krammer The Netherlands

DTBird and DTBat start operating in The Netherlands
First DTBirdV8 unit and DTBatD3 unit have started operating in Windpark Krammer, located in Zeeland, The Netherlands. Additional units will be installed during the wind farm construction until 2019. These are the first DTBird&DTBat units installed in concrete towers.

DTBird model installation Wind Farm Krammer The Netherlands

DTBird Team visits the wind farm where a new test program has started

Two DTBirdV4D8 units are operating with Collision Avoidance module D8 (8 speakers distributed at 2 heights, below the lower point reached by the blades and below the nacelle). Each unit has two settings (sound activated/muted) which switch from one to the other every week. Every week, one unit has the sound activated while the other is muted.

The wind farm is located in Castilla y León (Spain) and the most frecuent species detected in the vicinity of the wind turbines are: Gyps fulvus, Milvus milvus, Buteo buteo and Falco ssp.

The collected data will be used for the species specific evaluation of the DTBird Collision Avoidance module.

DTBird DTBat team visit Spanish wind farm Castilla y León

DTBird&DTBat Team wind farm visit in Castilla y León, Spain.

DTBird Team visits the wind farm where a new test program has started

Two DTBirdV4D8 units are operating with Collision Avoidance module D8 (8 speakers distributed at 2 heights, below the lower point reached by the blades and below the nacelle). Each unit has two settings (sound activated/muted) which switch from one to the other every week. Every week, one unit has the sound activated while the other is muted.

The wind farm is located in Castilla y León (Spain) and the most frecuent species detected in the vicinity of the wind turbines are: Gyps fulvus, Milvus milvus, Buteo buteo and Falco ssp.

The collected data will be used for the species specific evaluation of the DTBird Collision Avoidance module.

DTBird DTBat team visit Spanish wind farm Castilla y León

DTBird&DTBat Team wind farm visit in Castilla y León, Spain.

DTBird finishes first phase of a research program to improve the Collision Avoidance module

DTBird in cooperation with the Spanish Wildlife Recovery Center (GREFA) and the Animal Medicine and Veterinary Surgery Faculty of the Complutense (Spanish University) has tested the hearing of the following bird species: Aquila chrysaetosFalco naumanniGyps fulvus and Milvus milvus.

The Audiogram Plots of these species will be used to create new species-specific collision avoidance sounds and to adjust the design of speaker's location and sound levels emitted, customized for both target species and wind turbine dimensions. The bird's hearing research is still open to add more species and individuals.

DTBird GREFA UCM Gyps fulvus hearing test

Griffon vulture (Gyps fulvus) sedated during the hearing test.

DTBird finishes first phase of a research program to improve the Collision Avoidance module

DTBird in cooperation with the Spanish Wildlife Recovery Center (GREFA) and the Animal Medicine and Veterinary Surgery Faculty of the Complutense (Spanish University) has tested the hearing of the following bird species: Aquila chrysaetosFalco naumanniGyps fulvus and Milvus milvus.

The Audiogram Plots of these species will be used to create new species-specific collision avoidance sounds and to adjust the design of speaker's location and sound levels emitted, customized for both target species and wind turbine dimensions. The bird's hearing research is still open to add more species and individuals.

DTBird GREFA UCM Gyps fulvus hearing test

Griffon vulture (Gyps fulvus) sedated during the hearing test.

DTBird & DTBat Gold Sponsor CWW 2025 DTBird EU Business Hub Japan 2025

 

Meet us in Montpellier and/or in Tokyo

Newsletter
Automatic Bat Monitoring & Protection
DTBat® is a self-working System that detects bat presence in real-time, and takes automatic actions linked to bat detection.
Remarkable applications of DTBat® System are:
  • Autonomous Bat Monitoring.
  • Bat Mortality Reduction through automatic actions.
DTBat® Clients have access to the DTBat® System recordings through an online Software Application named DTBat® Data Analysis Platform (DAP).
 
BatAbout2
DTBat® Detection Module
DTBat® Detection Module surveys the airspace with Bat recorders, detecting and recording bat passes in real-time. Installation design and operational settings are customized for any Target Species and WTG dimensions.
DTBat® Detection Module is equipped with 1 to 3 Bat recorders installed at height on the WTG tower and/or on the nacelle. Recorders are placed in specific locations to achieve the best surveillance of the moving blades area.
DTBat® Stop Control Module
DTBat® Stop Control Module automatically Stops and restarts WTG according to bat activity detected in real-time and/or environmental variables.
Stop trigger and Stop duration criteria are adjustable to target Species or to cover a % of the total bat activity detected (e.g WTG stopped for 95% of the bat activity detected).
aboutBAT3
DTBat Data Analysis Platform
DTBat® Data Analysis Platform (DAP)
DTBat® DAP is a complete online Software Application to provide transparent access to review bat sonograms, environmental data and WTG operational parameters. Graphics and Automatic Service Reports for selected periods are also available. Includes two access right levels: Analyzer and Manager.
DTBird® & DTBat® Worldwide Presence
DTBird Worldwide Installations 2023
DTBird® & DTBat® features are demanded by environmental administrations of an increasing number of countries. Over 500 DTBird® & DTBat® units have been installed at over 110 existing / projected, onshore /offshore wind farms in 16 countries (Austria, Belgium, China, France, Germany, Greece, Italy, Norway, Poland, Spain, Sweden, Switzerland, Taiwan, The Netherlands, the United Kingdom and the United States). DTBird® is operating at WTG since 2009 and DTBat® since 2012.
Latest News
We are happy to announce that we've been selected as one of the 50 EU SMEs companies to participate in EU Business Hub - Japan and the Republic of Korea's next commercial mission for Green and Sustainable Technologies to...Tokyo, Japan! This is an EU-funded programme that supports EU businesses in the green, digital, and healthcare sectors to enter the markets of Japan and the Republic of Korea. During the business mission, we will have the opportunity to establish valuable contacts with local Japanese companies as we exhibit our DTBird & DTBat solutions at the EU pavilion. Key Dates & Place: ?️ Sept 15th…
DTBird selected for EU Business Hub Japan 2025 mission!
Written on Monday, 07 July 2025 15:23
Hello summer! We will be kept busy during these hot months as we finalize preparations for our future exhibition after the summer in Montpellier, South of France. We will attend the 8th Conference on Wind Energy & Wildlife Impacts. The Conference will take place from September 8th to 12th at Corum, the Convention Center of Montpellier. For this edition, we are once again Sponsors. With every edition, new projects and developments are presented.  If you are in town or nearby, please drop by and ask our Sales team members all your queries about bird and bat monitoring at Wind Farms: Pricing, efficiency…
Meet DTBird & DTBat at Montpellier for CWW 2025!
Written on Tuesday, 01 July 2025 13:55
Our CEO, Agustín Riopérez has been invited to give a presentation on the DTBird & DTBat systems at Renewable Energy Sources of Croatia's event: DANI OIE 2025 in the Hotel Le Meridien Lav, Split, Croatia from May 21st - 23rd. He has been invited to give a remote introductory presentation as part of Panel 8 - Developing RES While Preserving Nature and the Environment – Practice, Challenges, and Solutions. The panel will explore the feasibility of the existing protection measures in practice and the discrepancies between legislation, design, and implementation. Topics will include automated systems for birdlife protection for wind turbines, the use of…
DTBird & DTBat Presentation at DANI OIE 2025!
Written on Monday, 12 May 2025 11:40
Announcement | Today at 12.30 CET, Spain experienced a national power outage affecting all mobile & internet communications. Electrical power is being restored late in the evening across all regions, including Madrid, where we are based. We will check all DTBird & DTBat units operating worldwide, ensuring the systems are running smoothly. As well as ensure our employees and trainees can work correctly from the Office or remotely. We apologize for the inconvenience caused, and if any meetings or email communications had to be postponed!       Our daily operations and systems will be back online ASAP.  
National Power Outage at the DTBird Office
Written on Monday, 28 April 2025 23:25
See all news
Contact
DTBird® & DTBat® are trademarks of Liquen Consultoría Ambiental,S.L., a leading Spanish Technological Firm specialized in Wildlife Protection at Wind Farms.
 
With Headquarters in Madrid, and worldwide installations, Liquen Team is the unique Seller and Technical Support Provider of DTBird® & DTBat® Technology.
 

+34 91 344 90 86

Let's talk